Siemens
Siemens Rail Infrastructure for Network Rail Limited | Case studies
Osirix Consulting is proud to work closely with Siemens Mobility.
We have provided support to 5 major bids – in PQQ and ITT stages and in multiple phases – and a number of smaller projects to Siemens Mobility. We are proud that Siemens was successful in all bids supported by Osirix Consulting and is currently transforming passenger rail services across the United Kingdom.
High Speed 2 (HS2) Control, Command, Signalling and Traffic Management systems PQQ
Siemens Rail Infrastructure for High Speed 2 Limited
Project Overview: HS2 required a specialist contractor to deliver a state-of-the-art European Train Control System (ETCS), Automatic Train Operation (ATO) and Traffic Management (TM) systems to control Britain’s high-speed rail services reliably and frequently. The Control, Command, Signalling (CCS) and Traffic Management (TM) Systems contracts will require the winning bidder to deliver the work with a combined value of £540m.
Timeframe
February/July 2020
Investment
£540m
Results
Successfully submitted in July 2020
TransPennine Route Upgrade – West of Leeds
Siemens Rail Infrastructure for Network Rail Limited
The TRU programme aims to deliver improvements to connectivity and capacity on the TransPennine route between Manchester Victoria and Selby / York via Huddersfield and Leeds. Its goals include:
- Leeds to Manchester Victoria target journey time of 44 minutes with 1 stop
- York to Manchester Victoria target journey time of 67 minutes with 2 stops
- Capability to operate 8 x 24m vehicles for InterCity services and 6 x 24m maximum for local services
- A performance target of 92%.
Timeframe
July/October 2019
Investment
£317m
Performance
Being evaluated by DfT
Traffic Management Partner
Siemens Rail Infrastructure for Network Rail Limited
Project Overview: The Traffic Management Partner tender represented the onboard element of the East Coast Digital Programme (EDCP), with tenderers required to team up with suppliers from the start to design, develop and deploy the European Train Control System (ETCS) technology and transform the East Coast Main Line into the first fully digital railway in the UK.
Timeframe
April/July 2019
Investment
£180m
Results
Successful bidder
Major Signalling Framework for Control Period 6
Siemens Rail Infrastructure for Network Rail Limited
The UK-wide, Major Signalling Framework is collectively worth £2.4bn throughout Control Period 6 (2019-2024), with a possible two-year extension between 2024-26 up to £3.6bn. The contracts were designed to boost the reliability of assets, decrease railway delays and increase network capacity across the UK.
Timeframe
January 2019/July 2019
Investment
£960m
Performance
Successful bidder for two lots
East Coast Train Control Partner
Siemens Rail Infrastructure for Network Rail Limited
Project Overview: The East Coast Digital Programme (ECDP) is a cross-industry initiative that will help transform the performance of the East Coast Main Line, one of the busiest and most important economic routes in the UK. Comprising of three contracts valued at around £1.1bn, the first stage of the East Coast Digital Programme is intended to lay the foundations for a wider roll-out of cab signalling across the network.
Timeframe
October 2018/April 2019
Investment
£1.1bn
Results
Successful bidder
List | Case studies
High Speed 2
Control, Command, Signalling and Traffic Management systems PQQ
TransPennine Route Upgrade
West of Leeds
Full Case study List
Check out all of our Case study projects